Sewage treatment works gets £2.6m upgrade to improve water quality

Staff
By Staff
2 Min Read

Yorkshire Water is investing £2.6 million to upgrade a sewage treatment works (STW) to improve river and coastal water quality.

The facility in Kilham will soon welcome a new 800m² acerated rush bed constructed adjacent to the existing treatment works.

The company says the nature-based solution will provide additional treatment for excess storm water during periods of heavy and prolonged rainfall, helping reduce pressure on the treatment works and reduce the number of discharges into the local watercourse.

Recently, Yorkshire Water has been under fire for being responsible for 260 pollution incidents in 2025. It was then downgraded to the lowest possible rating and then followed by the CEO stepping down.  

Stephanie Pullan, Yorkshire Water Director of Asset Management, said the company was “looking at our operational performance, making sure that we’re being as predictive as we can be”.

The rush bed uses plants alongside an aeration system to help naturally treat storm water as it passes through the wetland. It will be capable of treating up to 11.6 litres of storm water per second. 

The upgrade will also include new pumps, monitoring and sampling equipment, aeration blowers and associated pipework and control infrastructure. The new rush bed will be elevated to help protect it from flood risk. 

The scheme forms part of an Environment Agency and Defra-approved trial exploring the use of Treatment Wetlands to reduce storm discharges and groundwater entering the sewer network. 

Copyright © 2026 Energy Live News LtdELN

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *